Skip to Content

Indiana will get $227 million waste to fuel plant

CleanTech Group has announced brings use news about a partnership with between International Power Group and ForeverGreen to build a hazardous waste to energy plant in LaFontaine, Indiana. While most waste-to-energy facilities are focusing on municipal trash, this new plant will target medical, chemical and industrial waste. Those materials are difficult and expensive to dispose of, making fuel production a more viable alternative. The plant will use a gasification process developed by ForeverGreen to turn the waste material into methanol, hydrogen and some electricity. The $227 million facility, which is expected to begin operation in 2010, will process 750 tons of waste per day.

UPDATE: a previous version of this post incorrectly stated that CleanTech is building this plant.

[Source: Cleantech Group]

Add your comments

Please keep your comments relevant to this blog entry. Email addresses are never displayed, but they are required to confirm your comments.

When you enter your name and email address, you'll be sent a link to confirm your comment, and a password. To leave another comment, just use that password.

To create a live link, simply type the URL (including http://) or email address and we will make it a live link for you. You can put up to 3 URLs in your comments. Line breaks and paragraphs are automatically converted — no need to use <p> or <br /> tags.



Featured Galleries

  • LA 2009: Mitsubishi PX-MiEV
  • LA 2009: Mitsubishi i-MiEV for Geek Squad
  • Honda P-NUT
  • LA 2009: Honda P-NUT
  • Ford Focus Econetic
  • Capstone Turbine CMT-380
  • Quick Spin: 2011 Chevrolet Volt pre-production prototype
  • Toyota iQ Livery
  • Tesla Store Monaco
  • 2009 Rolls-Royce Phantom
  • Smart ED production
  • Tesla Roadster audio recording for video games

Categories


Autoblog

Daily Finance

Download Squad

Engadget

Joystiq

Autoblog Spanish

Switched.com

FanHouse

Asylum